A few days ago was the day and man am I tired! After months of waiting through winter, we picked yesterday to pour the concrete bond beam on top of the back wall. We have been preparing for this pour since we started work on the house again in February; screening gravel and sand, building the bond beam form and hauling in the portland cement we needed for the job.
It was an ugly morning. Rain the night before with heavy winds, and neither the rain nor the wind had completely died down. We started setting up not really convinced that we would actually start pouring concrete. Nobody wanted to be the one to cancel the pour, and after a couple of rounds back and forth discussing options the decision was left to me. Not one to be hasty I deliberated and we got started right away ... Fortunately the rain cleared up and we had sunshine with really heavy winds for most of the day.
We decided to mix our own concrete for this job rather than have it delivered from a plant in Kamloops. I estimated that the pour would require at most 4 cubic yards of concrete and the minimum delivery is approximately 5 yards (concrete is now sold by the cubic metre which is slightly larger than a cubic yard). So, if we had ordered concrete I would have had to have planned ahead by having additional forms ready for concrete. Also, due to delivery charges (we are about an hour away from the closest concrete plant), the delivered concrete is that much more expensive if you order a small volume. Given our desire to save money and our limited ability to plan ahead it seemed a no-brainer to mix our own concrete.
We have mixed lots of concrete on this project and in the past, but never this much at one time. Our little cement mixer can mix two cubic feet of concrete. Given that there are 27 cubic feet in a yard, we would need to mix about 60 batches of concrete for this job. Assuming we could mix a load every ten minutes we would be looking at about ten hours of non-stop work just mixing the concrete, not to mention pouring it onto the forms and leveling. We quickly decided we needed more manpower on this job ...
The first workers we lined up for the job were John (aka John Deere) and Bob. Bob actually insists on going by BobCat ... I find this really '70's, but he packed all of the concrete from the mixer to the forms so whatever name he wants to be called is fine by me! The cement mixer on the back of the green John Deere tractor is driven by the PTO (power take off) of the tractor, and it can handle about a sixth of a yard per batch. So, we only had to to do about 20 batches of concrete. The tractor was parked by the sand/gravel pile all day, and the mixer ran for most of the day spinning the mixer. When a batch of concrete was ready it was dumped into the bucket of the bobcat and taken to the building site. Thank you Tom, Stephanie, Robin, Jody, Mike and Linda for the loan of all of this equipment!
The bobcat is small and mobile enough that it could be taken inside the building walls. The operator then lifted the bucket to the height of the forms and dumped the concrete out. Unfortunately, the bobcat had just enough lift to get the bucket over the edge of the form and the bucket could not be tipped far enough so that the concrete would simply slide out. We had to shovel the concrete from the bucket into the forms. Still, this was much easier than building scaffolding and carting the concrete around in wheelbarrows!
After the concrete was dumped in the forms it needed to be shoveled (or vibrated) so that it flowed everywhere and eliminated any air pockets. Finally, the concrete was leveled and smoothed so that it was consistent throughout the entire form. We were not very concerned about smoothness as this concrete will not be exposed when the building is finished.
The last step was to insert the anchor bolts. These bolts are spaced 4' apart and will be used to attach a wooden sill to the top of the concrete bond beam. The rafters of the roof will ultimately be attached to this sill plate. You want to get the bolts in fairly soon after the concrete is poured and leveled, as otherwise it becomes unworkable. We simply put the bolts in after we finished leveling another 10' or so of the concrete in the form.
We started this job at around 9:30 in the morning and finished right around 5:00 in the evening with about a half hour for lunch. We worked all day and our neighbors, Robin and Jody (thanks guys!), were there for about half of the day. It was hard work but all of the equipment made the day go that much easier and painlessly (We still hurt at the end of the day!).
Some notes about the concrete ...
The concrete for our beam is specified as 3000 PSI (pounds per square inch) with reinforcement.
The reinforcement consists of two horizontal runs of 10 mm rebar with vertical rebar every other tire driven into the top three tires and extending to within the top two inches of the form. We also used engineering fibres in our concrete mix.
Our formula for the concrete was 1 part portland cement, 2 parts sand and 3 parts gravel. The dry ingredients were added to the mixer with sufficient water to hydrate the mixed materials (you do not want to add too much water as this will weaken the concrete). We then added engineering fibres and allowed the batch of concrete to mix for another couple of minutes.
I figured out that one 40kg bag of dry portland cement has a volume of about 28.6 litres. We dumped one bag of cement (very heavy!) into the mixer for each batch of concrete. This in turn meant that we needed 143 litres of aggregate (2 parts sand; 3 parts gravel) for each batch. We filled 7 twenty litre pails and added their contents to the mix. Generally, I slightly under filled the aggregate buckets to ensure that I was getting a slightly higher proportion of cement in each batch. I did this to make slightly stronger concrete.
We ended up using 22-40 kg bags of portland cement which works out to slightly less than 4 cubic yards of concrete. So, my initial estimate was pretty close! I am glad that day is over.
We have already started prepping the roof beams, but I suspect we will start work on the front wall first. The front wall is required to finish the roof, and I am not keen to have the roof beams installed and weathering in the sun while we work on the front wall.
Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts
Wednesday, March 31, 2010
Wednesday, January 20, 2010
The Bond Beam
Given the warm weather we have had lately (all our snow is gone and it has consistently been above 0 degrees celcius), we are planning the next stage of our building project. If the weather stays warm we hope to start building again too!
The main tire wall was finished last fall. The next step is placing a bond beam on top of this wall. This beam ties the walls and roof of the building together and increases the stability of the walls.
We have decided to pour a concrete bond beam as detailed in Volume III of the Eartship books, as opposed to using the laminated 2x12 bond beam described in volume I. We chose this route as we would prefer to minimize any wood that ultimately might be back filled. Also, the sad reality is that I am trained as an engineer; both solutions seem adequate, but concrete just leaves me feeling that much better about the situation. This decision does mean more time and cost.
The Bond Beam
Our bond beam will be 8" wide by 8" high with two continuous runs of 1/2" rebar. The beam will be anchored to the tire wall by; excavating every second tire, and driving a 3' length of 1/2" rebar into each excavation such that approximately 6" of rebar remains above the top of the tire and will be buried in the concrete poured for the beam.
The perimeter of the back tire wall of the earthship is (I simply took this from the plans):
12' + 08' + 12' + 16' + 28' + 11' + 15'+ 11' + 11' + 12' + 28' (7x4') + 18' = 182'
So, our bond beam will have an approximate length of 182'.
Figuring out the concrete required for this bond beam:
concrete in beam = 2/3' x 2/3' x 182' = 81 cubic feet = 3 cubic yards
This does not allow for the holes excavated in the tops of the tire or variations in tire heights that mean more concrete is used. So ... rough estimate of 4 cubic yards.
I figure on the following materials for the bond beam:
The Bond Beam Form
A form needs to be built to hold the concrete after it is poured, until it sets up. I figure I have two options here...
Option 1: A Pop Can and Concrete Form for the Bond Beam
As outlined in Volume III many earthship builders use a pop can and concrete form instead of wood. This is done primarily (I believe) to reduce the amount of wood used in the project.
Some rough calculations ...
Option 2: A Lumber Form for the Bond Beam: My rough numbers
Assuming I use lumber for my forms, I need the following materials:
I believe I have gathered enough pop cans to consider the first option for forming the beam. However, I would probably use all the pop cans I have accumulated to date, and be left looking for more later on.
I actually have access to low grade lumber suitable for forming the beam. It makes more sense to me to use lumber for this form; the material is available to me, and I think it will be easier to finish around the roof beams down the road. The simple reality is that if I do not use the lumber for this job, it will need to be re-worked for some other use.
Using lumber will probably not save me much money, as I will require fasteners for the form which I currently do not have. I do hope that this decision will save us time and labour.
The main tire wall was finished last fall. The next step is placing a bond beam on top of this wall. This beam ties the walls and roof of the building together and increases the stability of the walls.
We have decided to pour a concrete bond beam as detailed in Volume III of the Eartship books, as opposed to using the laminated 2x12 bond beam described in volume I. We chose this route as we would prefer to minimize any wood that ultimately might be back filled. Also, the sad reality is that I am trained as an engineer; both solutions seem adequate, but concrete just leaves me feeling that much better about the situation. This decision does mean more time and cost.
The Bond Beam
Our bond beam will be 8" wide by 8" high with two continuous runs of 1/2" rebar. The beam will be anchored to the tire wall by; excavating every second tire, and driving a 3' length of 1/2" rebar into each excavation such that approximately 6" of rebar remains above the top of the tire and will be buried in the concrete poured for the beam.
The perimeter of the back tire wall of the earthship is (I simply took this from the plans):
12' + 08' + 12' + 16' + 28' + 11' + 15'+ 11' + 11' + 12' + 28' (7x4') + 18' = 182'
So, our bond beam will have an approximate length of 182'.
Figuring out the concrete required for this bond beam:
concrete in beam = 2/3' x 2/3' x 182' = 81 cubic feet = 3 cubic yards
This does not allow for the holes excavated in the tops of the tire or variations in tire heights that mean more concrete is used. So ... rough estimate of 4 cubic yards.
I figure on the following materials for the bond beam:
- 24 bags portland cement (4 cubic yards of concrete)
- engineered fibres (how much?)
- 550 lineal feet 1/2" rebar (2 runs x 182' + 40 tires x 3' + min. 18" lapping = 550 ?)
- hay wire (to wire the lapped rebar)
- embedded fasteners in the concrete to secure the beams (not sure what these are yet)
The Bond Beam Form
A form needs to be built to hold the concrete after it is poured, until it sets up. I figure I have two options here...
Option 1: A Pop Can and Concrete Form for the Bond Beam
As outlined in Volume III many earthship builders use a pop can and concrete form instead of wood. This is done primarily (I believe) to reduce the amount of wood used in the project.
Some rough calculations ...
- A pop can is basically 5" long x 2.5" in diameter.
- This means each can has a volume of 3.14 x (2.5/2)^2 x 5" = 24.54 cubic inches = 0.0142 cubic ft.
- A lineal foot of can wall will use at a minimum 3 cans in each horizontal course (total of 9 cans for 1 sqft of wall).
- A lineal foot of the bond beam form wall will use a total of 6 cans as it is only 8" high. Ignoring these 6 cans, a lineal foot of the form wall needs 5" x 8" x12" = 480 cubic inches of concrete. Subtracting the volume of the tin cans this works out to 332.76 cubic inches of concrete or 0.00713 cubic yards of concrete per running foot of can wall for the bond beam form
- volume of concrete = 2 x 182' x 0.00713 cu.yards/' = 2.6 cubic yards
- number of cans = 2 x 182' x 6 cans/' = 2184 cans
- fasteners to hold rebar in place during the pour
Option 2: A Lumber Form for the Bond Beam: My rough numbers
Assuming I use lumber for my forms, I need the following materials:
- fasteners to hold the two sides of the form together while concrete is poured,
- fasteners to hold rebar in place during the pour,
- lumber fasteners for the lumber,
- lumber for the forms
I believe I have gathered enough pop cans to consider the first option for forming the beam. However, I would probably use all the pop cans I have accumulated to date, and be left looking for more later on.
I actually have access to low grade lumber suitable for forming the beam. It makes more sense to me to use lumber for this form; the material is available to me, and I think it will be easier to finish around the roof beams down the road. The simple reality is that if I do not use the lumber for this job, it will need to be re-worked for some other use.
Using lumber will probably not save me much money, as I will require fasteners for the form which I currently do not have. I do hope that this decision will save us time and labour.
Tuesday, January 12, 2010
Reflections on our tire press
We've been getting emailed questions about our tire press, so I thought I would attempt to recap our experiences with it.
As described in an earlier posting we built the press out of materials we had on hand. The press design is quite simple. The unit consists of:
The hydraulic cylinder is approximately 1' retracted length (including the attached steel plates) and extends out another 3-4" at full extension. The steel plates are 5/16" thick and were cut from steel pipe that was approximately 16 inches in diameter. The photo shows the initial plates that I used that came close to packing an entire tire in one pass. These plates were impractical ... it was too hard to place the packer in a tire, and it simply did not pack well. We settled on much smaller plates that were only about 6" wide.
As shown in the video (below this paragraph) the size of the packer is dictated by the inside diameter of the tires being filled. The packer is dropped into a previously hand packed tire that is still hollow in the middle. With the packer fully retracted, dirt is then shoveled into the tire so that when the packer cylinder is extended the new and existing dirt is packed into the tire. The packer is rotated and this process is repeated until the tire is sufficiently packed.
After the tire is sufficiently packed, the packer is removed. The tamper is then used to fill and compact the centre of the tire.
Our tamper was simply an old sprocket welded to a five foot length of steel pipe. The whole
unit weighs significantly more and has a much wider packing head (approximately 8" diameter) than a sledge hammer. It was very effective at packing the centre of the tires.
Many thanks to Mike Casey for building and lending this packer to us!
Tamping requires a person to straddle the tire and compact the dirt by pounding the tamper up and down while periodically adding dirt until the tire is filled and compacted.
Care needs to be taken to not stand on the edges of the tire being tamped initially, as you run the risk of reducing the compaction of the tire by collapsing the dirt in the rim. You also do no want to strike the side walls of the tire with the packer as this will also reduce the compaction of the tire.
Our packer was fairly small and portable. We mounted the hydraulic pump and electric motor combination on a wheel barrow so that it could be moved easily from tire to tire. We ran a 50' extension cord to an available electrical outlet. (We also ran the unit off of a 3500 watt gas generator during a power failure.) The hoses were long enough such that the packer could be used at the top of an eight foot wall with the packer at the base of the wall.
As the walls got higher the packer stayed inside the building, and we brought dirt to the tires from the outside of the building and backfilled as we went. This meant that moving the dirt was done at ground level and the operator of the packer stood on a ladder as the walls got higher. We had to extend the lever controlling the cylinder so that the person operating it could still extend and retract the ram.
I guess the important question is was it worth it? Was the packer effective? Did we save time, money or labour?
In terms of cost our packer was essentially free. I had all of the parts needed to make this unit, although I did cannibalize one piece of equipment that will have to be put back together. Also, I did all of the welding and assembly, and it went together surprisingly quickly. So, there was very little cost in building this unit. I suspect you could pay a few thousand dollars buying and scrounging the parts needed.
The packer proved to be very effective in packing the tires, it did a very consistent job of filling and compacting the rims of the tires. I can only compare the effectiveness of the packer to tires we filled with sledge hammers on our first tier and tires I have seen in finished buildings. Both methods seem equally effective at compacting dirt in a tire. One advantage of the packer is that it did not get tired, and loose oomph as the day went on. Quality control was critical regardless of the method used, and we were careful to consistently inspect finished tires.
We definitely saved a lot of hard labour using the packer. We were exhausted after a day of hand packing the tires. The hydraulic press eliminated the physically demanding effort of packing with the sledge hammer. The tamping was still done by hand (and generated lots of complaints) but was far easier than the alternative.
I also think that the packer saved us time. A crew of three was very efficient when filling tires; one to operate the packer, one to shovel dirt and one to tamp tires and supply dirt to the shoveler. I am estimating (guessing?) that we could easily have done half a row of tires a day (approximately 40) and finished the main tire wall in under a month with a dedicated crew of three to four people. It took us three months, we did not work steadily, and our crew of volunteers changed constantly. I suspect that either method can be very efficient. The bigger issue with either method is keeping people busy packing tires. A lot of time and effort goes into moving, supplying and preparing material (dirt, tires, water and cardboard). More than once we stopped working to scrounge tires, move dirt or cut cardboard!
Ultimately, at the end of the day using a hydraulic packer meant that the crew was as happy at the end of the day as at the beginning!
As described in an earlier posting we built the press out of materials we had on hand. The press design is quite simple. The unit consists of:
- a stubby hydraulic cylinder,
- two rounded steel plates welded at either end of the cylinder,
- a control valve to extend and retract the cylinder,
- hydraulic hose plus fittings,
- and a portable hydraulic pump that plugs into a standard 120 volt wall outlet.
As shown in the video (below this paragraph) the size of the packer is dictated by the inside diameter of the tires being filled. The packer is dropped into a previously hand packed tire that is still hollow in the middle. With the packer fully retracted, dirt is then shoveled into the tire so that when the packer cylinder is extended the new and existing dirt is packed into the tire. The packer is rotated and this process is repeated until the tire is sufficiently packed.
After the tire is sufficiently packed, the packer is removed. The tamper is then used to fill and compact the centre of the tire.
Our tamper was simply an old sprocket welded to a five foot length of steel pipe. The whole
unit weighs significantly more and has a much wider packing head (approximately 8" diameter) than a sledge hammer. It was very effective at packing the centre of the tires.
Many thanks to Mike Casey for building and lending this packer to us!
Tamping requires a person to straddle the tire and compact the dirt by pounding the tamper up and down while periodically adding dirt until the tire is filled and compacted.
Care needs to be taken to not stand on the edges of the tire being tamped initially, as you run the risk of reducing the compaction of the tire by collapsing the dirt in the rim. You also do no want to strike the side walls of the tire with the packer as this will also reduce the compaction of the tire.
Our packer was fairly small and portable. We mounted the hydraulic pump and electric motor combination on a wheel barrow so that it could be moved easily from tire to tire. We ran a 50' extension cord to an available electrical outlet. (We also ran the unit off of a 3500 watt gas generator during a power failure.) The hoses were long enough such that the packer could be used at the top of an eight foot wall with the packer at the base of the wall.
As the walls got higher the packer stayed inside the building, and we brought dirt to the tires from the outside of the building and backfilled as we went. This meant that moving the dirt was done at ground level and the operator of the packer stood on a ladder as the walls got higher. We had to extend the lever controlling the cylinder so that the person operating it could still extend and retract the ram.
I guess the important question is was it worth it? Was the packer effective? Did we save time, money or labour?
In terms of cost our packer was essentially free. I had all of the parts needed to make this unit, although I did cannibalize one piece of equipment that will have to be put back together. Also, I did all of the welding and assembly, and it went together surprisingly quickly. So, there was very little cost in building this unit. I suspect you could pay a few thousand dollars buying and scrounging the parts needed.
The packer proved to be very effective in packing the tires, it did a very consistent job of filling and compacting the rims of the tires. I can only compare the effectiveness of the packer to tires we filled with sledge hammers on our first tier and tires I have seen in finished buildings. Both methods seem equally effective at compacting dirt in a tire. One advantage of the packer is that it did not get tired, and loose oomph as the day went on. Quality control was critical regardless of the method used, and we were careful to consistently inspect finished tires.
We definitely saved a lot of hard labour using the packer. We were exhausted after a day of hand packing the tires. The hydraulic press eliminated the physically demanding effort of packing with the sledge hammer. The tamping was still done by hand (and generated lots of complaints) but was far easier than the alternative.
I also think that the packer saved us time. A crew of three was very efficient when filling tires; one to operate the packer, one to shovel dirt and one to tamp tires and supply dirt to the shoveler. I am estimating (guessing?) that we could easily have done half a row of tires a day (approximately 40) and finished the main tire wall in under a month with a dedicated crew of three to four people. It took us three months, we did not work steadily, and our crew of volunteers changed constantly. I suspect that either method can be very efficient. The bigger issue with either method is keeping people busy packing tires. A lot of time and effort goes into moving, supplying and preparing material (dirt, tires, water and cardboard). More than once we stopped working to scrounge tires, move dirt or cut cardboard!
Ultimately, at the end of the day using a hydraulic packer meant that the crew was as happy at the end of the day as at the beginning!
Tuesday, November 3, 2009
The Building Site - Winter is here
We've had snow over the last couple of days. So far none of it is sticking!
I have been slow to post updates the last while ... so lets see.
In mid-october we backfilled the exterior walls. The walls are now ten tires high (8') and bermed on the outside right up to the tenth row. The exterior walls are very stable, but the interior walls (which are currently unsupported) are wobbly when you stand on the top and hit them hard with something. Most of the construction accounts I have read describe this instability. When the walls are restrained by the bond beam and roof they are very solid.
Before we bermed to the tops of the walls we had some heavy rain. At that point we had not sloped the ground behind the building site away from the building. Runoff pooled behind the wall in the kids' bedroom and flowed through the tire wall. Not something you want to see! When we backfilled in October, we also contoured and sloped the land behind the building so that runoff moves away from the building. We have since had even heavier rain and the walls looked great. It is always nice to see things work the way they are supposed to!
Since that time Sandra and I have been winterizing the property and getting ready for winter.
At this point we do not think we will make significant progress on the house over the winter, but we will take things as they come. The next steps are pouring the bond beam and starting the roof.
I have been thinking and doing more about electrical generation and heating systems, and I will start posting some of my thoughts and work in these areas in the next little while!
I have been slow to post updates the last while ... so lets see.
Before we bermed to the tops of the walls we had some heavy rain. At that point we had not sloped the ground behind the building site away from the building. Runoff pooled behind the wall in the kids' bedroom and flowed through the tire wall. Not something you want to see! When we backfilled in October, we also contoured and sloped the land behind the building so that runoff moves away from the building. We have since had even heavier rain and the walls looked great. It is always nice to see things work the way they are supposed to!
Since that time Sandra and I have been winterizing the property and getting ready for winter.
At this point we do not think we will make significant progress on the house over the winter, but we will take things as they come. The next steps are pouring the bond beam and starting the roof.
I have been thinking and doing more about electrical generation and heating systems, and I will start posting some of my thoughts and work in these areas in the next little while!
Wednesday, October 21, 2009
Pouring the last 1/2 tires!
Saturday, October 10, 2009
The U walls are done!!!!
Today we catch up on other chores: hay for the barn loft for the winter and we will finish preserving our apples. I still have to try Josh's chutney recipe and we are loving the apple juice so much we will make more!
Sunday takes us to Tom and Steph's cabin for turkey and Monday finds us adding a layer of rigid insulation to our thermal wrap in anticipation of backfilling on the 16th.
Next week is our anniversary (14 or 20 depending on whether we celebrate marriage of togetherness :) !!) so we are taking a few days off to go to the theatre, out to dinner, spend some time together without the kids (thanks Dad and Gail) and do what every couple does to celebrate 20 years together...go to an equipment auction! Chris is eying a snowplow blade and I'm curious what the small stock trailer will go for.
Friday, October 9, 2009
So close!
We are already looking ahead to what we can do before winter and I think we have accepted that we will not get the roof on before snow flies. We will move forward with the bond beam and I will be extremely happy if that gets poured this fall. Then, on good days, I can sand our weathered round log beams and then stain in the shop (heated). When they are stained and dried we will put them on the bond beam, putting them in place as we go. Might be able to work on other parts of the roof if we get a spate of really good weather this winter, but we are happy poking along and getting other parts lined up for a fast start in early April.
Dad showed up today with 31 tires giving us enough to finish the walls. What a relief. Although we will need to collect some 225 tires for the front wall in the spring, completing the 235 tire collection is a major milestone!
On a completely different note, the rooster took a run at me today! He can be a little aggressive to say the least. I think he is being "henpecked", though. When I let the chickens out today his feathers looked more than a bit ruffled and I think I saw blood on them.
Here are a few photos from today (none of the rooster going for me!)
Thursday, October 8, 2009
Making great progress on round #10
Today my brother Thomas and sister-in-law, Steph, came to help with the tires. It was a bit chilling in the morning but we had some great sun later on. We had to stop at about 2 pm for piano lessons, but still managed to get about 24 tires filled with their help.
Steph brought leftovers for lunch: Chana Masala, some spicy lamb chops and spinach paneer. That together with a few quarts of our apple juice, pita bread, my homemade relish, roasted tomatoes and samosas (which came up from Vancouver with Steph earlier in the week) we had a spread that I wish we could feed all our volunteers!
They will be back tomorrow and hopefully we will get slightly more than 24 filled, leaving us with only 10-15 to complete on Saturday.
My father picked up 13 more tires in Kamloops today, leaving us with only 17 more to complete round #10. He will swing by Insight Tire and Auto in the morning to see what they have. We could be in good shape to be done by Saturday!
On the 16th Alvin returns to finish backfilling the tire walls and then he will remove his wondrous backhoe for the season. This will leave us in good shape to be able to work on the roof from the outside of the building.
Chris and I have been re-reading and plotting our next steps. We will be doing a continuous concrete bond beam on top of the tires. The forms will be made from setting pop cans in really stiff mortar. We finally start to use the many pop cans everyone has been donating to our non pop-drinking family!
My father, who recently sand blasted the outside of his log house, has got Katie started on collecting dry sand for us as we intend to sandblast our round beams for the house. Then, I'm going to stain them before we place them on the roof.
The big question is whether we will go past pouring the bond beam this season. A lot will depend on the weather. Two people this week have said an early cold winter but I think they were reading the same almanac, personally!
On the 17th we have another couple coming to help for 3-4 days. We should just be starting the bond beam then so they will be learning along with us! I think this activity will be very easy for the kids to involve themselves in; it should be like playing in the mud!
Here are some photos of today's work!


Steph brought leftovers for lunch: Chana Masala, some spicy lamb chops and spinach paneer. That together with a few quarts of our apple juice, pita bread, my homemade relish, roasted tomatoes and samosas (which came up from Vancouver with Steph earlier in the week) we had a spread that I wish we could feed all our volunteers!
They will be back tomorrow and hopefully we will get slightly more than 24 filled, leaving us with only 10-15 to complete on Saturday.
My father picked up 13 more tires in Kamloops today, leaving us with only 17 more to complete round #10. He will swing by Insight Tire and Auto in the morning to see what they have. We could be in good shape to be done by Saturday!
On the 16th Alvin returns to finish backfilling the tire walls and then he will remove his wondrous backhoe for the season. This will leave us in good shape to be able to work on the roof from the outside of the building.
Chris and I have been re-reading and plotting our next steps. We will be doing a continuous concrete bond beam on top of the tires. The forms will be made from setting pop cans in really stiff mortar. We finally start to use the many pop cans everyone has been donating to our non pop-drinking family!
My father, who recently sand blasted the outside of his log house, has got Katie started on collecting dry sand for us as we intend to sandblast our round beams for the house. Then, I'm going to stain them before we place them on the roof.
The big question is whether we will go past pouring the bond beam this season. A lot will depend on the weather. Two people this week have said an early cold winter but I think they were reading the same almanac, personally!
On the 17th we have another couple coming to help for 3-4 days. We should just be starting the bond beam then so they will be learning along with us! I think this activity will be very easy for the kids to involve themselves in; it should be like playing in the mud!
Here are some photos of today's work!
Wednesday, October 7, 2009
Photos
Dad's apple tree. Not totally picked yet!
Hugo, playing in the sun.
Chris, waiting for me to put the camera down.
Chris and Hugo. This would have been a good spot for me to use the zoom...I think I can zoom in on this picture, too, after taking it. Things to figure out.
The southwest corner of the house.
Wednesday, September 9, 2009
Fall and the Building Site
Cooler temperatures arrived around here right at the beginning of September. We no longer have the oppressive heat of July and August, and we have had a significant amount of rain that we were sorely lacking over the last two months.
Sandra and I have been working away on the eighth round of tires since the beginning of the month, and we are now a third of the way done. We hope to be done this round of tires by early next week. The kids had their first full day of school today, and we packed 18 tires while they were gone.
We used up all of our tires today, so hopefully Gary (Sandra's dad) has some luck in Kamloops today and brings back lots of tires. Thanks Gary!
Because we are now bringing in tires as we are using them the last two courses of tires have been layed out slightly differently. I am mixing different sizes of 235's much more as I lay them down. I started doing this for the simple reason that I do not have tires all of one size to do an entire row anymore. The results have been amazing! I have eliminated most of the spacer blocks that I used in courses four and five. Had I thought this through at the beginning I would have used multiple tire sizes in every course. Using multiple sizes makes getting everything to fit MUCH easier.
Most of the last week has been a write off due to the Barriere fall fair last week end. The kids showed their sheep. This did not go as well as hoped for, the kid's Suffolk meat sheep did not compare well against other breeds at the fair. There are three weeks left before we go to the Kamloops Winter Fair and the kids sell their sheep. We are increasing the food for the sheep and the kids are exercising them more. Hopefully, this will improve the sheep's finishing, and lead to better results and prices!
We also had some really positive results at the fair! Stephen entered a trio of laying pullets (chickens) and got a first! Sandra and the girls entered baked goods ranging from cakes to rustic bread, and walked away with a number of ribbons for their efforts. Sandra was most pleased with a first for her rustic bread, and the girls both got ribbons for the cakes they baked.
There are some ominous clouds on the horizon. The dump truck has been running poorly the last couple of times I used it; it is backfiring, has no power and is belching white smoke. Some discussion with Gary and Mike Casey leads me to believe that one of the cylinders may not be firing or compressing. I borrowed a compression tester from Mike Casey, and popped the hood this evening to see if I could track the problem. I've got problems ...
The white smoke I saw last time I ran the truck was obviously more than smoke. There was a fire in the engine compartment. The oil and sawdust mixture glued to everything in the compartment (not something I recommend having on you engine, but it is an occupational hazard) ignited and burned off. I am assuming this happened after I parked the truck as there were no obvious signs of an on-going engine-fire when I stopped the truck.
Fortunately the fire did not spread, and went out on its own. The bad news is that the covering on a number of wires was burned off, and some hoses are burned through. These will all need to be replaced. The worst damage seems to be an aluminum housing attached to the engine that is now a puddle of aluminum (three puddles actually). I do not know how significant this housing is (or more importantly what it housed), and will have to dig around over the next couple of days. This is a very common engine (a 427 V8) so parts should be easy to track down. Amazingly, I turned the ignition on and the engine cranked over ... that is a very good sign! I spend my days cursing the old equipment I use, but it sure takes a lot to put it down for the count.
If the truck is unavailable for a while we will have to figure out an alternative for moving more gravel to the building site. A problem for tomorrow ...
Sandra and I have been working away on the eighth round of tires since the beginning of the month, and we are now a third of the way done. We hope to be done this round of tires by early next week. The kids had their first full day of school today, and we packed 18 tires while they were gone.
We used up all of our tires today, so hopefully Gary (Sandra's dad) has some luck in Kamloops today and brings back lots of tires. Thanks Gary!
Because we are now bringing in tires as we are using them the last two courses of tires have been layed out slightly differently. I am mixing different sizes of 235's much more as I lay them down. I started doing this for the simple reason that I do not have tires all of one size to do an entire row anymore. The results have been amazing! I have eliminated most of the spacer blocks that I used in courses four and five. Had I thought this through at the beginning I would have used multiple tire sizes in every course. Using multiple sizes makes getting everything to fit MUCH easier.
Most of the last week has been a write off due to the Barriere fall fair last week end. The kids showed their sheep. This did not go as well as hoped for, the kid's Suffolk meat sheep did not compare well against other breeds at the fair. There are three weeks left before we go to the Kamloops Winter Fair and the kids sell their sheep. We are increasing the food for the sheep and the kids are exercising them more. Hopefully, this will improve the sheep's finishing, and lead to better results and prices!
We also had some really positive results at the fair! Stephen entered a trio of laying pullets (chickens) and got a first! Sandra and the girls entered baked goods ranging from cakes to rustic bread, and walked away with a number of ribbons for their efforts. Sandra was most pleased with a first for her rustic bread, and the girls both got ribbons for the cakes they baked.
There are some ominous clouds on the horizon. The dump truck has been running poorly the last couple of times I used it; it is backfiring, has no power and is belching white smoke. Some discussion with Gary and Mike Casey leads me to believe that one of the cylinders may not be firing or compressing. I borrowed a compression tester from Mike Casey, and popped the hood this evening to see if I could track the problem. I've got problems ...
The white smoke I saw last time I ran the truck was obviously more than smoke. There was a fire in the engine compartment. The oil and sawdust mixture glued to everything in the compartment (not something I recommend having on you engine, but it is an occupational hazard) ignited and burned off. I am assuming this happened after I parked the truck as there were no obvious signs of an on-going engine-fire when I stopped the truck.
Fortunately the fire did not spread, and went out on its own. The bad news is that the covering on a number of wires was burned off, and some hoses are burned through. These will all need to be replaced. The worst damage seems to be an aluminum housing attached to the engine that is now a puddle of aluminum (three puddles actually). I do not know how significant this housing is (or more importantly what it housed), and will have to dig around over the next couple of days. This is a very common engine (a 427 V8) so parts should be easy to track down. Amazingly, I turned the ignition on and the engine cranked over ... that is a very good sign! I spend my days cursing the old equipment I use, but it sure takes a lot to put it down for the count.
If the truck is unavailable for a while we will have to figure out an alternative for moving more gravel to the building site. A problem for tomorrow ...
Saturday, August 29, 2009
More of the same, but new people!
On Tuesday Mike Slobogean drove up from White Rock and the next morning we were initiating him to filling tires. He just left this afternoon and with his help we completed row #6. Peter Robinson of Westbank arrived last night and today we gave a crash course in earthships, as he is leaving us tomorrow morning sometime.
My cousin Gerald and his partner/wife/ and one of their sons, Arlo, arrived this evening just in time to help out, too. We are almost finished the first "U" of the seventh round.
My cousin Trevor (he is actually my cousin Alan's son and Gerald's nephew; I'll let you sort it out) showed up to get his hands dirty too. So we had a fairly sizeable crew for a few hours this evening.
Our photos are fairly repetitive right now. Tires, dirt, more tires, more dirt.
Unfortunately I did not have my camera with me when I headed down to our pharmacy to pick up more cardboard a few days ago. My friend Shelly had shown me where the store stacks its cardboard outside and I had been picking it up as needed. This time when I went there was a raised cage that cardboard was being stored in. It had a slot at the top and it was locked. Rather than wait for the store to open to ask them to unlock it, I went to the hardware store to see if they had any cardboard.
The hardware store also had one of these wooden cages and when I asked if they could unlock it and let me take the contents I was told that the cages were part of the town's new cardboard collection program. Hmmm. I drove quickly around town and discovered that while we were shooting the rapids in Bowron, Barriere was locking up its garbage!!!
I quickly phoned Chris for ideas as we were desperate for that cardboard.
He had talked to the folks at the dump and had been told we could go through their huge bins whenever we wanted. All the cardboard in these cages ends up there eventually anyway.
So up to the dump where Alan cranked open the great big green bin and voila!!! My PICK of corrugated cardboard. I was so excited I fell over my own feet and knocked my shin against the bin, leaving me with a whopper of a bruise. To match the one Mike gave me when he shoveled a rock onto my hand!
We will be working away on round #7 with an eye to completing it before Tuesday...wish us luck!
On Tuesday I will be shopping for a new camera as ours died and the kids are pretty protective of their own digital cameras!
My cousin Gerald and his partner/wife/ and one of their sons, Arlo, arrived this evening just in time to help out, too. We are almost finished the first "U" of the seventh round.
My cousin Trevor (he is actually my cousin Alan's son and Gerald's nephew; I'll let you sort it out) showed up to get his hands dirty too. So we had a fairly sizeable crew for a few hours this evening.
Our photos are fairly repetitive right now. Tires, dirt, more tires, more dirt.
Unfortunately I did not have my camera with me when I headed down to our pharmacy to pick up more cardboard a few days ago. My friend Shelly had shown me where the store stacks its cardboard outside and I had been picking it up as needed. This time when I went there was a raised cage that cardboard was being stored in. It had a slot at the top and it was locked. Rather than wait for the store to open to ask them to unlock it, I went to the hardware store to see if they had any cardboard.
The hardware store also had one of these wooden cages and when I asked if they could unlock it and let me take the contents I was told that the cages were part of the town's new cardboard collection program. Hmmm. I drove quickly around town and discovered that while we were shooting the rapids in Bowron, Barriere was locking up its garbage!!!
I quickly phoned Chris for ideas as we were desperate for that cardboard.
He had talked to the folks at the dump and had been told we could go through their huge bins whenever we wanted. All the cardboard in these cages ends up there eventually anyway.
So up to the dump where Alan cranked open the great big green bin and voila!!! My PICK of corrugated cardboard. I was so excited I fell over my own feet and knocked my shin against the bin, leaving me with a whopper of a bruise. To match the one Mike gave me when he shoveled a rock onto my hand!
We will be working away on round #7 with an eye to completing it before Tuesday...wish us luck!
On Tuesday I will be shopping for a new camera as ours died and the kids are pretty protective of their own digital cameras!
Tuesday, August 25, 2009
Back at the Tires!
Chris and I started filling tires again today. We've got 12 done on the 6th round and the best news is that Chris thinks we may only have to do nine rounds! We are welcoming some more volunteers this week and weekend. Glad that the weather is cooler, but we lose the light earlier in the evening.
Monday, August 3, 2009
Backfilling
This process has involved laying out a 'wall' of rigid insulation behind the building and covering that wall with a double layer of 6 mil poly.
After the thermal wrap is in place we are using an excavator to backfill behind the tires and to berm around the thermal wrap. We tried using the backhoe but it was an exercise in frustration. Due to its age and hard use the backhoe is difficult to control (its worn out!) and this job requires precision, otherwise the insulation gets damaged. With the tractor pushing dirt to the excavator this job went fairly quickly. The following video gives you an idea ...
The entire process of laying out the thermal wrap has been slow and frustrating. It is a slow job, requires a fair bit of patience and is poorly documented in the literature on earthhips. I did notice in the last couple of weeks that Earthship Biotecture has posted on this subject on their website and apparently the second edition of Comfort in Any Climate will have some more detail.
We are now ready to carry on filling tires (five more rows to go), and will start again when we get back from our kayaking trip mid-august!
Thursday, July 30, 2009
Wednesday, July 29, 2009
Half Way There!
We have finished the fifth row of tires!
Only five more to go ...
Unfortunately I have NO pictures of this milestone as our camera is broken! We are attempting to solve this problem ...
The last of our July volunteers left yesterday. Thank you to everybody who came and helped over the last month, this progress would not have been possible otherwise!
Anna made a surprise comment the evening before she left. It went something like "Pounding tires is much more enjoyable than studying for my chiropractic exams!" I admit I added the emphasis but the quote is true ... So for all you people faced with a dreadful work prospect, just remember we have something more enjoyable here and its a FREE activity!
Sandra and I have spent the last few days catching up on house chores and taking a bit of a break. The garden is thriving ... mostly. The potatoes seem to have been struck down by blight, but the tomatoes vines are groaning and the onions will be ready soon.
The chickens are starting to lay eggs. We are getting about two a day now, and one of them today was actually quite large. The chickens have taken to invading the lamb enclosure, but happily the chickens and lambs get along well.
The lambs are steadily putting on weight, and all seem to be shaping up nicely. Have I mentioned that 4H lambs taste wonderful?
Over the next couple of days we plan to get more of the thermal wrap installed and berm the first five courses of tires. We also need to finish installing the building services (water lines, electrical, telephone).
We do not anticipate getting a lot done over the next two weeks as next week we are going on a kayak adventure to the Bowron Lakes. We are planning to navigate the 116 km circuit of the lakes so we will let you know how that goes.
Last weekend we prepared for our trip by dumping the kayaks ...
Only five more to go ...
Unfortunately I have NO pictures of this milestone as our camera is broken! We are attempting to solve this problem ...
The last of our July volunteers left yesterday. Thank you to everybody who came and helped over the last month, this progress would not have been possible otherwise!
Anna made a surprise comment the evening before she left. It went something like "Pounding tires is much more enjoyable than studying for my chiropractic exams!" I admit I added the emphasis but the quote is true ... So for all you people faced with a dreadful work prospect, just remember we have something more enjoyable here and its a FREE activity!
Over the next couple of days we plan to get more of the thermal wrap installed and berm the first five courses of tires. We also need to finish installing the building services (water lines, electrical, telephone).
We do not anticipate getting a lot done over the next two weeks as next week we are going on a kayak adventure to the Bowron Lakes. We are planning to navigate the 116 km circuit of the lakes so we will let you know how that goes.
Last weekend we prepared for our trip by dumping the kayaks ...
Thursday, July 23, 2009
Installing thermal wrap...insulating our thermal mass!
To
Here is the beginning of our thermal wrap, installed on the east wall. Essentially we increase the thermal mass of the tire walls by wrapping them and 3-6 feet of dirt with rigid insulation and poly. During winter, the insulation traps the thermal mass of the tires and dirt and slows down the heat transfer into the rest of the bermed wall, allowing our house to remain warmer longer.
We decided to match the R value of a traditional basement wall, which is 12. This piece of blue styrospan is 2.4 inches thick and is suitable to be buried. Earthship Biotecture recommends doubling the insulation using two, two inch pieces, mostly for added rigidity for backfilling, but also to gain a few extra R values.
We decided to stick with one layer of R12. The original earthship designs did not even include a thermal wrap and as we intend to heat with an auxiliary source, we made the call to stick with a single layer. This picture shows the 2x8 sheet of insulation with the 6 mil poly that will run on the outside of the insulation, into the edge of the drainage system.
Here it is with the second and third piece attached. As each piece is placed, we are leveling them individually and to each other.
Chris and James extending the insulation along the north wall.
Here's the insulation (again on the east side), next to the cleanout for the drainage system. The insulation takes a 45 degree turn around the first U (our bedroom!)
Here it is from the opposite direction with the poly tuck taped to the insulation. Our next layer of poly will overlap by 6 inches. We will take the insulation up to about six feet (as we continue filling tires) and then the rigid insulation will slant inwards to the roof, creating a "ceiling" for the thermal wrap.
Looking east to west. As we turn the corner we add more poly and attach it to the piece already sloping into the drainage system (not shown here).
We are holding the insulation in place by means of these small wooden "cradles". Made of scrap wood, each is intended to cradle the ends of two adjoining pieces of rigid insulation (thereby necessitating the bare minimum of cradles). Where the insulation turns, we use a dedicated cradle for the end of each piece. We are also tuck taping the joins of the insulation. This also helps keep it aligned. To answer an obvious question: yes we will bury the wooden cradles. Who cares if they degrade down the road. The bermed walls will more than hold the insulation in place over time.
We only set the thermal wrap to about half of the north side of the walls. We need to feed our services through the conduits we placed under the first round of tires and we still need to figure out what some of those are (including the proper gauge wire for renewable electric)! Alvin brought in his amazing excavator to help us with drainage and backfilling, so we had him backfill oh-so-carefully around each side of our thermal wrap. He has a delicate hand on the controls; it's the hours he's spent with kids and grandkids, playing Nintendo since the 80s! Here's a video of him doing the backfilling. We sent him away until Monday when we hope to have the thermal wrap set on the remainder of the building for backfilling.
Tomorrow we lose James. He's been here just over a week, having made his way across Canada from Newfoundland with the intention of settling in Victoria. Before getting himself set up there and looking for work, he decided to make a stop and help us with our home. He's been taking carpentry and has lots of insightful questions for Chris about the construction. At first he worked only with us, before Sean and Anna made their way back from Victoria to rejoin us. They brought Josh last Sunday and the four of them have worked in concert since then. Josh is a story teller and always sees the humour in situations. Despite having very little construction experience, he has been digging in with fervor since arriving. He's headed to Calgary tomorrow for a wedding and then will return to Victoria to his work. Chris and I hope both James and Josh will come back again and help with another aspect of our project. Together with Sean and Anna I will always think of this group of 20-somethings as the "Fab Four", they are relentless workers and were the first ones to sign on to the Darfield Earthship!
We are looking forward to welcoming other volunteers in the coming weeks!
We decided to match the R value of a traditional basement wall, which is 12. This piece of blue styrospan is 2.4 inches thick and is suitable to be buried. Earthship Biotecture recommends doubling the insulation using two, two inch pieces, mostly for added rigidity for backfilling, but also to gain a few extra R values.
We decided to stick with one layer of R12. The original earthship designs did not even include a thermal wrap and as we intend to heat with an auxiliary source, we made the call to stick with a single layer. This picture shows the 2x8 sheet of insulation with the 6 mil poly that will run on the outside of the insulation, into the edge of the drainage system.
We only set the thermal wrap to about half of the north side of the walls. We need to feed our services through the conduits we placed under the first round of tires and we still need to figure out what some of those are (including the proper gauge wire for renewable electric)! Alvin brought in his amazing excavator to help us with drainage and backfilling, so we had him backfill oh-so-carefully around each side of our thermal wrap. He has a delicate hand on the controls; it's the hours he's spent with kids and grandkids, playing Nintendo since the 80s! Here's a video of him doing the backfilling. We sent him away until Monday when we hope to have the thermal wrap set on the remainder of the building for backfilling.
Tomorrow we lose James. He's been here just over a week, having made his way across Canada from Newfoundland with the intention of settling in Victoria. Before getting himself set up there and looking for work, he decided to make a stop and help us with our home. He's been taking carpentry and has lots of insightful questions for Chris about the construction. At first he worked only with us, before Sean and Anna made their way back from Victoria to rejoin us. They brought Josh last Sunday and the four of them have worked in concert since then. Josh is a story teller and always sees the humour in situations. Despite having very little construction experience, he has been digging in with fervor since arriving. He's headed to Calgary tomorrow for a wedding and then will return to Victoria to his work. Chris and I hope both James and Josh will come back again and help with another aspect of our project. Together with Sean and Anna I will always think of this group of 20-somethings as the "Fab Four", they are relentless workers and were the first ones to sign on to the Darfield Earthship!
We are looking forward to welcoming other volunteers in the coming weeks!
Subscribe to: