Building An Earthship In Darfield, B.C.

We are a family of five living in Darfield, BC.
Our house is six hundred square feet in total and we are feeling cramped.

We have decided to build an earthship!

So starts the adventure ...

Showing posts with label plans. Show all posts
Showing posts with label plans. Show all posts

Friday, April 3, 2009

We have permission to land!!!!

The Earthship is cleared for landing! We received word today that the permit is all ready for us. We are quite excited and I know that Chris has been sorting shovels, starting equipment up and worrying about our tire count.

We do have to pay an additional $904 for our permit. The building authority bases the permit fee on square footage AND cost to build. Of course, I put $60,000 down for cost to build (that is what we are aiming for, as we have heard of others building for a little less and a little more). However, even that won't fly with the building authority. So based on 2250 square feet and $100/square foot (which the building authority decided based on some figures out of Michael Reynolds books).

So the entire permit fee is $1544 which includes a refundable $200 if we complete the house within 2 years.

Please stay posted as we begin to make plans to start construction!

Thursday, April 2, 2009

Still waiting...

Yesterday we submitted the last two documents that our building authority requested. Unfortunately the building inspector who is plan checking our project is not in the office until Friday but will look at it then. We are assuming that the final check is simply routine as both documents we submitted were sealed by professionals. Chris has already revved up the equipment and is ready to begin excavation as soon as the permit is in our hands...

For the next few days we will move on to projects we have had to set aside: building our chicken coop, preparing our skis for summer storage, gathering more tires...

Tonight the kids pick out their market lambs. Although they won't get them until May, they will choose them now at about 2 weeks old (cute!).

Saturday, March 28, 2009

Meeting With Building Authority

Its been about three weeks since we submitted the plans and Sandra phoned mid-week to get an update of where we are at in the approval process. When we submitted the plans we were told that it was taking about three weeks to get a set of plans approved ...

Sandra talked over the phone with the building inspector assigned to review our file. What came out of this discussion is that construction techniques used in an earthship fall outside of the prescribed methods outlined in Part nine of the 2006 British Columbia Building Code (BCBC), and as such the alternative solution that we are proposing has to be shown to functionally meet the minimum prescriptive requirements outlined in Part 9. Section 2.3 of the Code provides a guideline of the requirements for documenting an acceptable alternative solution. Don't worry if your head is spinning ... it took me a while to wade through all of this.

Our business has been building log houses for over thirty years (first with Sandra's dad designing the buildings and most recently me). Log structures also fall outside of Part 9 of the Building Code. Basically an engineer is required to stamp (certify structural compliance) the design as the Building Code does not cover log construction, and the Building Authority does not have the expertise to evaluate it.

In discussions we have had with other people building earthships in various jurisdictions their permitting experience generally involved getting an engineer to stamp the plans as I have just described for log buildings. So when we submitted our plans to the Building Authority I stamped the plans as was our practice for log structures.

After Sandra's telephone conversation with the building inspector we took a look at the Code sections that the Building Authority was referring to. In 2006 a new iteration of the Building Code was released. A significant change in this release of the Code was the introduction of objectives and functional statements in lieu of the prescriptive practices outlined in Part 9 of the Building Code. The intention of this change is to allow for alternative building solutions that are not addressed by Part 9 of the Building Code. However, any proposed alternative building system has to be shown to meet the minimum prescriptive requirements outlined in the Code.

Feeling that we now understood what was being asked we requested a meeting with the inspector to go over what was required. We are able to set up a meeting quite quickly and on Friday morning we sat down with the inspector and the building department head.

The meeting went quite well. They confirmed that due to the unique nature of the building project we would need to submit a technical brief on the alternative building method being used as required in the new Building Code. We gave a brief overview of the earthship design principles and went over some of the material we were using to design our house (Earthship Volumes I-III and the Engineer's Report from New Mexico). These materials (particularly the Engineer's Report) went a long way towards addressing their concerns about the building system. What they requested at the end of the meeting was an overview and synopsis of earthship design principles that differ from Part 9 of the Building Code. They seemed quite satisfied that 'earthship' construction techniques were valid, well documented and backed up by actual completed buildings.

We hope to have the requested document in the Building Authority's possession by the end of this week so that we can proceed with our building project.

Friday, March 13, 2009

Waiting on Permit Approval, reading and septic thoughts ...

We thought spring was right around the corner last week when we submitted our building plans, but the last week has been bone chillingly cold. We were down to -20 degrees Celcius on a couple of evenings and the snow is just not melting. The driveway is a skating rink and unfortunately it slopes down to the highway. It is up over zero today, and the long term forecast is for warmer weather.

The good news is that I have read some more books during this cold weather!

My copy of Water From the Sky (Michael Reynolds) arrived a couple of days ago. I truly wish I had read this book prior to laying out my plans. This book is detailed and clarifies a number of issues that were not well explained in the Earthship Volumes. The book also has color pictures which give a much better idea of what a finished home might look like. Also, it provides good examples of what has worked and what has not worked based on thirty years of building experience. Hopefully I will be smart enough to listen and understand what is being described. It has certainly given me a number of ideas as I think about my building.

I borrowed a book called Earthships: Building a Zero Carbon Future for Homes (Mischa Hewitt and Kevin Telfer). This book was written about two earthships that were built in the United Kingdom. This is a well written book that goes into some construction and technical details. It also has good colour pictures of finished buildings.

I have also now had a chance to review the Engineer's Report sold by Earthship Biotecture that gives structural support for rammed earth tire walls. The report cautions about using earth cliffs as descrbed in the Earthship Volumes. It recommends getting the advice of a geotechnical engineer if you are planning to use this construction technique. Thankfully, this is not a concern for us as we plan to fully level our building site. Otherwise the report is positive about tire walls with lateral restraint (a bond beam)!

I also stumbled across a video on the internet that talks about gray water recovery and the permitting process in California. This is a good primer on the subjet and has an excellent list of books for further reading at the end. Sandra provided a link to this video on a previous post.

Possibly my single biggest discovery of the week was a briefing document written about the regulatory environment surrounding gray water in British Columbia (it obviously also has some application to the rest of Canada). It is called REGULATORY AND LEGISLATIVE BARRIERS TO AN EARTHSHIP-LIKE WATER/SEWAGE SYSTEM IN BRITISH COLUMBIA. I have asked the author for permission to post a link to this document on the blog as I do not know how available it is, but I have not yet heard back from him.

We have spent the rest of our week seeing if we can prove that the existing septic system on site is satisfactory to support our proposed earthship. We are required to submit proof of an acceptable existing septic system or get a permit to build a new one in order to get a building permit. Because we are increasing the size of our home the septic regulations require a larger septic tank and field than what was previously acceptable. There is no allowance in the current regulations for composting toilets or gray water recovery in dictating the size of a septic installation. We think our existing system is big enough and hopefully the inspector coming next tuesday agrees with us. Otherwise, we might be looking at the installation of a new septic system that will barely get any use, and cost in the neighborhood of $15,000 dollars. Our fingers are crossed!

Wednesday, March 4, 2009

No more plans!!!

Okay ... I am excited!

After too many long hours of work we took the plunge and submitted the plans to the building authority yesterday.

I feel like a huge weight has been lifted from my shoulders ... until the plans are actually submitted the urge to change and hopefully improve them is irresistible and it begins to feel like a never ending treadmill.

We spent about an hour going over the plans with the senior building inspector when we submitted the plans. He asked lots of questions, said they had seen tires used in buildings before although nothing of the scope shown in our drawings. It was a good discussion. He said that it would take about two weeks for them to review the plans, and (hopefully) at the end of that we will have a building permit.

In addition to evaluating the structure of the building over the last couple of weeks I have been mulling over the water systems in the earthship ...

Gray Water Recovery

As mentioned in previous posts the gray water recovery system has been causing me sleepless nights.

I have done a lot more research over the last couple of weeks and am still waiting for my copy of Water From the Sky (Mike Reynolds) so that I can do some more. Having said that I am now comfortable with the workings of one of these systems. My design is shown beside this paragraph. I am drawing heavily from my reading of Earthship Volume III and Create an Oasis with Graywater. The gray water planters are closed systems; the water cannot drain to native soil until it has spent a period of time in the planter's filtration bed, by which time it is suitable for non-potable uses such as irrigation.

The idea here is that the bulk of the water is consumed by the plants (transpiration and evaporation). Treated water can also ultimately be withdrawn from the system via the treated water overflow outlet and used outside. Our ultimate intention is to have the overflow outlet feed into a gravel bed beneath an area planted with fruit trees.

Rain Water Harvesting

The other activity that has been consuming a lot of my time is harvesting and storage of rain water.

Our intention is to use this harvested water for irrigation and possibly non-potable uses like the washing machine, shower and tub. Here again my design is shown beside this paragraph.

It turns out that an excellent overview of this subject has been written right here in BC. It is titled Rainwater Harvesting on the Gulf Islands: Guide for Regulating the Installation of Rainwater Havesting Systems- Potable and Non-potable Uses, and is written by Dick F. Stubs. I came across it on the internet.

Moving On

The last couple of months has been consumed with getting a set of building plans completed.

The snow has been melting the last couple of days and we are now thinking about how best to prepare so we can hit the ground digging (and pounding) when the snow disappears.

Hopefully tire collection will start again by the end of the week, and I have to start thinking about equipment maintenance. The tractor has been (and still is) buried under snow all winter.

On unrelated but exciting notes...

I just ordered seeds for the garden. (we will be gunning for bigger tomatoes and blue Russian potatoes this year).

We are getting 25 laying chickens and 25 meat birds in about a month. We are thinking that the kids can make some money selling eggs to so far, unsuspecting relatives and friends, and more compost for me.

The kids are planning on 5 sheep between the three of them this year. I am hopeful that a few of these sheep may be Friesens (a European dairy sheep).

I think I need to get outside and do some work ...

Tuesday, March 3, 2009

Plans have been submitted for a building permit!

The whole thing cost us $200 (application fee only, more to come!) and we still have to double check a few things. I sent the original HPO application by Greyhound ($13) to ensure we could get the paperwork back in the 2-3 weeks it may take for permit approval from our regional building authority.

The paperwork....was tremendous! I am dead certain that the amount of paperwork exceeded what we filled out when we got married, had three babies, and bought our first house...combined! There were at least 9 pages of signed documents, not including the two copies (7 pages each) of house plans.

It seemed to go very well. We met with the senior building inspector and went over the major systems to explain them a bit more. He had already seen a few tire buildings, but not something as elaborate as our home. What we are planning on doing does not seem to be out of the realm of experience for our building authority but I'm fairly certain our home will marry many of the systems only seen individually in the past...

Now we wait... in the meantime, we will try posting about some of the issues we have been ignoring for several weeks while Chris finalized the plans...

Thursday, February 12, 2009

The Complete (incomplete) Plan set

The rendered perspective at the beginning of this post is an image of the earthship buried in the ground.

You can see berms at the back (north end) of the roof to channel collected water from the roof into the cisterns. The ducting to accomplish this collection is not shown. The two cylinders behind the earthship are the cisterns. (I am so excited!!)





I will be updating the drawings on this page as I continue to update the building plans.

I had hoped to include PDF files of the drawings, but I am having problems uploading PDF's to the server. In the interim I have included the drawings as JPEG's.

The plan set consists of the following six drawings:

Perspectives









Floor Plan - Main









Floor Plan - Foundation









Roof










Elevations - East and West









Elevations - North and South










Gray Water







This is the first draft of our earthship's plan set!

This plan set is unfinished but it does give an idea of the direction the plans are heading.

The drawings are incomplete and not entirely consistent.

Over the coming weeks I will be updating these plans as I finalize our plans for submission to our local building authority.

Revisions

Feb 17, 2009 Modified floorplan and foundation pages with new bathroom layout.

Feb 19, 2009 Continued to update all pages. Still have not done engineering on plans. I think I am going to have to add additional pages for gray water and plumbing.

March 4, 2009 Submitted plan set to the Thompson Nicola Regional District Building Department. I added a page for gray water design, added additional details on the roof page for water collection, and made many changes on the other pages. We were told to expect somewhere around two weeks for review of the plans. This is exciting ...

Thursday, January 22, 2009

Investigating Graywater


I’ve spent the last couple of days trying to wrap my head around the implementation of a gray water recovery system for the earthship. The information provided in the Earthship volumes by Mike Reynolds is not detailed, and as gray water recovery is not a common building practice it is difficult to find information on this topic.

First a bit of background … Fresh water (from a well or rainwater cache) is degraded after it is used residentially; it becomes either black or gray water. Black water refers to the outflow from toilets, which contains fecal matter and is difficult to treat. Gray water is the outflow from the remaining plumbing fixtures in the house; sinks, showers, baths and laundry. This water is easier to treat and it is this water that we will be recovering in our gray water recovery system.

From my initial research the regulatory work done on gray water systems in Canada is only at beginning stages, and deals mostly with the recovery of gray water for later use in flushing toilets. This model of gray water recovery stresses the chlorination/treatment of the gray water so that it can be stored for later use. This is an expensive process requiring chemicals, storage and pumping that is not what we are interested in. Our intention is to contain, filter and then use the gray water in a constructed wetland environment located in our residence. The gray water will be purified in this environment and used to grow plants and fruit trees. This basic approach is described in Earthship Volume 3, but as I said earlier, the implementation details are vague.

In Canada the CHMC (Canadian Housing and Mortgage Corporation) is doing some research into gray water systems, and seems to be involved in defining standards. Cate Soroczan is listed as the Project Manager on much of this work and would seem to be a useful contact. I intend to start with the CHMC to determine what regulations govern the implementation of a gray water system in our jurisdiction and what standards exist.

My other approach to investigating gray water was to try and determine generally accepted construction methods and practices with regard to gray water recovery. As gray water recovery is not used in mainstream North American construction there seem to be a lot of conflicting opinions and practices in this field. The work of Art Ludwig is referenced often on the internet by various organizations (The Real Goods for one) and people, and as it turns out he has two books out on the subject; ‘Create an Oasis with Gray Water’ and the ‘Builder’s Gray water Guide’. I have decided to pin my hopes on Art Ludwig’s experience and have ordered these two books (www.oasisdesign.net). Hopefully, when these two books arrive I can start laying out a gray water recovery system in earnest.

In the meantime I think I have tracked down enough information to flesh out the square footage and basic layout required of a gray water system for my family of five. This should allow me to carry on with drawing my plans and ensuring that I have allocated enough space for gray water recovery and located the system logically in our home. The initial information on gray water that I will be using in my design is 35 gallons per day / per person of gray water generated residentially, and from .14 – 1.2 sqft of gray water ‘mulch field’ per gallon of gray water generated per day.

In other words, my family of five will generate 175 gallons of gray water per day, and the gray water field will need to be 24.5 sqft on the low side to 210 sqft on the high side. For the time being I am going to stick to the upper end of this estimate and design a gray water field of approximately 200 sqft. With this information in mind I have modified my plans as detailed in the attached drawing. I will modify them again as I learn more about gray water.

Most of the changes in this iteration of the plans are based on layout and our ultimate preferences. We re-arranged the kitchen and pantry for better work flow. Sandra wanted easy access to the outside from the kitchen so we added a vestibule and door in the middle. We have added a second toilet so that we are not all lined up to use the bathroom. I cannot easily figure out how to move the second bathroom closer to the master bedroom given the constraints imposed by the water system. Sandra and I have agreed we can live with this layout.

Wednesday, January 14, 2009

Floor Insulation; to insulate or not ... that is the question!


















This is a hot topic ... people have been weighing in both for and against floor insulation by email and on the blog. In fact you might even say the discussion has been heated ... alright I'm going to drop the puns from this point forward!

As near as I can make out the basic earthship design has evolved somewhat since the publication of Michael Reynold's third earthship book, and some of the newer design details do not seem to be readily available (unless I have missed them in my reading).

In his newer work Mike Reynolds refers to a thermal wrap around the earthship and it took a fair bit of digging (I can't help it) to find out what this thermal wrap is. It turns out the thermal wrap is a layer of rigid insulation placed around the bermed walls of the earthship after an initial backfill of the walls has been done.

I am assuming the point of this thermal wrap is to increase the amount of insulated mass attached to the earthship, and consequently to increase the efficiency of the 'thermal battery' that is the basis of the earthship design.

I have upgraded my initial drawing and include a cross section view of this whole idea at the top of this article. I believe that this thermal wrap is supposed to address issues that the earthship design has had in colder climates, specifically that it did not retain enough heat during the winter, and thus was not successful in regulating its temperature. Also, I have read complaints that despite a given earthship staying warm enough during the winter months, the floor temperature was simply too cold.

So, on the one side of this argument is the original earthship concept. The basic premise of this argument is that the minimum temperature of the earthship should not dip lower than about 55 degrees F (stable earth temperature), and the warming action of the sun during the day should in fact keep that temperature in an acceptable range of 65-75 degrees F.

On the other side of the argument are the reported failures of the earthship design in cold weather climates. Reading between the lines I think the failure of the design stems from the ground under and to the north of the earthship still being affected by seasonal temperatures. In other words, the ground under the earthship settles out somewhere between stable earth temperature and a value above freezing. I suspect this failure is also tied to quality of winter sun in various regions. We live in a valley and I have some concerns about the amount of sun we get in December.

So where do I weigh in on this entire argument ...

I have now been in an earthship in Ontario on December 20th (2nd shortest day of the year) and it was -20 degrees C outside. The inside temperature was about 65 degrees F and the only additional heat was provided by a wood cook stove when food was being cooked. The basic premise that the earthship should maintain a reasonable and consistent temperature was being met. The floor in this earthship was not insulated, and the builder agrees with Micheal Reynolds that the floor should NOT be insulated.

I have to admit, although not intolerable, I did find the floor cooler than I would have liked. I tend to agree with the basic statement that an uninsulated floor is going to be cooler than your desirable room temperature of say 20 degrees C simply because stable earth temperature is below this temperature. It seems to follow that in a colder winter climate the floor will be that much colder than desired room temperature.

I intend on having a backup heating system in my house. I am actually in favour of radiant heat as opposed to direct wood heat, and I would prefer a warm floor. It would be possible to run the radiant heat in the tire walls and/or the floor. I do not see any need to insulate or heat the floor under the planters and a few other locations. Beyond this I have not come to any conclusions.

Wednesday, November 26, 2008

The First Drawing of Our Earthship!

Over the last couple of weeks Sandra and I have been visualizing what our house will look like.

This is our initial floorplan.

The building would be slightly more than 2000 square feet.

I have drawn up numerous plans for our log house business, but an earthship definitely does not follow the norms. Consideration has to be given to the earthship systems (food production, solar gain and site layout, water management, materials), that are only touched on superficially in the usual design process.

I find myself full of questions that do not have the typical answers. I have not yet thought through the layout and integration of the systems that make up an earthship.

Water, Food, Waste Management and Gray Water
  • How many planters does a family of five need to recycle its gray water?
  • How effective is a composting toilet (what does it need)?
  • How much food do we want to produce in the building?
  • How do we lay out the pipes for graywater?

Solar Gain

  • How much sun can we expect in the winter? We live in a narrow valley that gets lots of cloud cover in the winter.
  • What will my backup heating system be?
  • Should we insulate the floor? There seems to be quite a debate over this issue in earthship design.

Anyway, the plans are started. I will start to tighten up the design and answer these questions (and more) over the next couple of months.

I am off to re-read Earthship Volumes I-III. I am also going to go and hang out at the post office and wait for my other two books ('Comfort In Any Climate' and 'Packaged Plan Option Book').

Any comments are welcome!